Page Content
At site there are still few units of the fire brigade operating.The situation is being kept under control. The fire of the pipeline was eliminated. At this point the facilities are being cooled down and control sampling regarding potential presence of pollutants in the air are being taken. No increased values confirmed up to now. Technicians are working on a definitive elimination of the damaged pipe. The roads 1/27 going through the chemical complex in Záluží remains closed.